Wuxi Komay Electric Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Colin
  • Company Name : Wuxi Komay Electric Equipment Co., Ltd.
  • Tel : 86-510-88266895
  • Fax : 86-510-88266895
  • Address : Jiangsu,Wuxi,No.6, Baishuxia District, Chunlei, Xishan Economic Development Zone
  • Country/Region : China
  • Zip : 214101

Copr Or Aluminum Crane Mobile Electrification Systems

Copr Or Aluminum Crane Mobile Electrification Systems
Product Detailed
Related Categories:Power Distribution Equipment

Detailed Product Description


Single pole insulated conductor rails offers a large selection for different applications and number of poles.

 

Standard application data:
Max.current(A):  250 - 320 - 500 - 800 - 1000 - 1250

Max.voltage(V):  600 (hand safe array 500 V)

Conductor cross section(mm2):100 - 160 - 230 - 300 - 450 - 580 - 600

Outside-Dimensions (Pol) [mm]: 19,0 x 25,0 / 24,0×32,0 / 32,0×42,0 / 38,0×46,0

Leakage-distance(mm):35 - 45(or 80) - 80

Resistance(Ω/km):0.2883 - 0.1922 - 0.1504 - 0.1153 - 0.0769 - 0.0596 - 0.0602

 

 

Mechanical properties:

Flexible strength:75N/mm2±10%

Tensile strength:40N/mm2±10%

 

Temperature range:

Common Housing:  -30oC up to +60oC

BAYBLEND Housing:  -20oC up to +115oC

 

Combustibility:

Flame retardant

Self extinguishing:class B 1-no flaming paricles,self-extinguishing.

 

Standard application data

Operating Conditions: for indoor and weather protected outdoor applications



Special features

High availability in strong industrial enviroment trough several material

High level of safety trough insulation profiles with integrated finger safe protection

Easy and exact mountig with multiple hangr clamps for (3, 4 and 5 pol)

Free and unlimited combination for multiple amount of rails

On side bending with optional bending device for curves possible

Main applications

EOT cranes

People Mover

Special purpose equipment

Maintenance

--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.

--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.

--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.

 



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.