- Auto Production Line Equipment[10]
- Material Handling Equipment Parts[19]
- Power Distribution Equipment[15]
- Cable Manufacturing Equipment[1]
- Pipe Making Machinery[1]
- Other Material Handling Equipment[2]
- Power Accessories[7]
- Cranes[1]
- Energy Saving Equipment Parts[2]
- Motorcycles[3]
- Electric Scooters[11]
- Other Wires[6]
- Other Wiring Accessories[10]
- Other Electrical Equipment[6]
- Chains[1]
- Industrial Brakes[7]
- Work Platforms[3]
- Cleaning Equipment[4]
- Other Switches[1]
- Electrical Plugs & Sockets[1]
- Traffic Light[1]
- Contact Person : Mr. Chen Colin
- Company Name : Wuxi Komay Electric Equipment Co., Ltd.
- Tel : 86-510-88266895
- Fax : 86-510-88266895
- Address : Jiangsu,Wuxi,No.6, Baishuxia District, Chunlei, Xishan Economic Development Zone
- Country/Region : China
- Zip : 214101
Crane Copper Conductor Bar
Detailed Product Description
Copperhead Conductor Systems are used for high-temperature, high dust, high corrosion, and other adverse circumstances.Superb quality of heavy duty of bimetallic (copper & steel) crane bar, of which the rated current ranges from 300 amperes up to 3,000 amperes enough to satisfy all the capacity for cranes running especilly at iron & steel mills, heavy industrial plants, etc.., which are exposed to extremely high temperature duing operation.
Standard application data
Nominal Current (at 100% duty cycle) [A]: 300 - 500 - 800 - 1000 - 1500 - 2000 - 3000
Nom. Voltage [V]: 600-3000 (with add. insulators)
Rail Length [mm]: 6.000
Weight(kg):24 - 26 - 30 - 36 - 51 - 72 - 120
Operating Conditions: for indoor and weather protected outdoor applications
Track Configuration: straight / easy onside adaptation to course layout
A complete set of 6 meter copper headed steel rail crane bar:
To consist of copper headed steel rail crane bar (trolley bar / bus bar), Joint keeper, Joint cover, Expansion section, Hanger clamp with insulator, Power feeder, Locating clamp, Pantograph collector, etc.
Detailed specifications and photos of each component are available upon request.
Maintenance
--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.
--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.
--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.