Wuxi Komay Electric Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Colin
  • Company Name : Wuxi Komay Electric Equipment Co., Ltd.
  • Tel : 86-510-88266895
  • Fax : 86-510-88266895
  • Address : Jiangsu,Wuxi,No.6, Baishuxia District, Chunlei, Xishan Economic Development Zone
  • Country/Region : China
  • Zip : 214101

Low-power mobile devices Seamless conductor bars

Low-power mobile devices Seamless conductor bars
Product Detailed

Detailed Product Description


 

Low-Power Insulated Conductor Systems are used for Three-dimensional warehouse,Ring application or slip rings,A diverse array of automated assembly line and more...

 

Standard application data

Nominal Current (at 100% duty cycle) [A]: 35 - 50 - 80 - 120 - 140

Nom. Voltage [V]: 600

Rail Length [m]: 100-10000m Customized according to customer requirements

Outside-Dimensions (Pol) [mm]: 12,0 x 18,0/15,0×15,0

Operating Conditions: for indoor and weather protected outdoor applications

Track Configuration: straight / easy onside adaptation to course layout

 

Mechanical properties:

Flexible strength:75N/mm2±10%

Tensile strength:40N/mm2±10%

 

Temperature range:

Common Housing:  -30oC up to +60oC

BAYBLEND Housing:  -20oC up to +115oC

 

Combustibility:

Flame retardant

Self extinguishing:class B 1-no flaming paricles,self-extinguishing.

 

Resistance to chemicals:+45oC

Gasoline:Sulphuric acid 50%

Mineral Oil:Caustic soda 25% & 50%

Grease:Hydro-chloric acid,concentrated.

 

Special features

High safety level with integrated finger protected insulation

Easy and exact mounting with multiple hangar clamps and bajonett conector technology

Unlimited amount of pole design for complex

Easy installation in courves with bending option

Flexible power feed options

 

Main applications

EMS Eleotro monorail systems

Stretcher / Packing equipment

Amusements rights

Ring application or slip rings

Stage equipment

Sorter

 

 

Maintenance

--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.

--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.

--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.

 



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.