Wuxi Komay Electric Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Colin
  • Company Name : Wuxi Komay Electric Equipment Co., Ltd.
  • Tel : 86-510-88266895
  • Fax : 86-510-88266895
  • Address : Jiangsu,Wuxi,No.6, Baishuxia District, Chunlei, Xishan Economic Development Zone
  • Country/Region : China
  • Zip : 214101

Single pole insulated conductor rails

Single pole insulated conductor rails
Product Detailed
Related Categories:Power Distribution Equipment

Detailed Product Description


Single pole conductor rail for curvaceous corses and ring or oval application. Preferably for EMS application with limited space.

Low-Power Insulated Conductor Systems are used for Three-dimensional warehouse,Ring application or slip rings,A diverse array of automated assembly line and more...

 

Standard application data

Nominal Current (at 100% duty cycle) [A]: 100

Nom. Voltage [V]: 600

Rail Length [mm]: 6.000 or 4,000

Outside-Dimensions (Pol) [mm]: 12,0 x 18,0

Operating Conditions: for indoor and weather protected outdoor applications

Track Configuration: straight / easy onside adaptation to course layout

 

Mechanical properties:

Flexible strength:75N/mm2±10%

Tensile strength:40N/mm2±10%

 

Temperature range:

Common Housing:  -30oC up to +60oC

BAYBLEND Housing:  -20oC up to +115oC

 

Combustibility:

Flame retardant

Self extinguishing:class B 1-no flaming paricles,self-extinguishing.

 

Resistance to chemicals:+45oC

Gasoline:Sulphuric acid 50%

Mineral Oil:Caustic soda 25% & 50%

Grease:Hydro-chloric acid,concentrated.

 

Special features

Fast mounting with plug and screw connector solution

Compact design for multiple poles on limited space (Phase distance 14 or 12 mm)

Easy mounting and flexible combination with 4,6,8 or 10 poles clamp in rail holder

Rail holder for all common EMS rail systems available

Flexible on side rail adaptation (bending device)

Power feed option on each connector or endcapposition possible

 

 

Main applications
EMS Eleotro monorail systems

Stretcher / Packing equipment

Amusements rights

Ring application or slip rings

Stage equipment

Sorter

 

 

Maintenance

--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.

--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.

--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.

 



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.